Construction on Meta’s Richland Parish AI Campus officially began in 2024 following the company’s public announcement of the $10 billion investment. The site is located on the 2,250-acre former Franklin Farm megasite between the towns of Rayville and Delhi in northeastern Louisiana. Site prep and early mobilization were underway shortly after the announcement, showcasing just how fast Meta’s project delivery model moves once greenlit.
Meta and its construction partners wasted no time. Within weeks of the site being announced, earthwork began, fencing was installed, and the first phases of infrastructure planning kicked off. The early work focused on grading, utility access, and road development to support the next wave of vertical construction.
This kind of speed is possible because Meta operates with a playbook. Its data center projects are built using standardized design systems, pre-approved vendors, and fast-tracked preconstruction workflows. That allows major components—like foundations, structural steel, and MEP systems—to be sequenced early, procured faster, and installed without unnecessary delays.
While many public projects stall during planning, Meta’s Richland Parish site serves as a model for how hyperscale construction can mobilize quickly and maintain momentum throughout the build.
Meta’s speed-to-site strategy doesn’t just move dirt fast—it builds trust and keeps the schedule ahead from day one.
While Meta hasn’t released an official public end date for the Richland Parish AI Campus, industry trends and past data center builds suggest a multi-phase timeline spanning approximately 24–36 months from initial mobilization. For a project of this scale—more than 4 million square feet of hyperscale infrastructure—turnover is expected to happen in stages, with the first mission-critical zones coming online well before full completion.
This phased delivery approach allows Meta to begin commissioning data halls, installing networking infrastructure, and testing power systems long before the entire site is complete. By mid-2025, it’s likely that portions of the facility will begin operations, while additional areas continue through MEP buildout, interior fit-outs, and systems integration.
Major components of the timeline include:
These stages often overlap to maintain momentum and reduce idle time between trades. Meta’s data center playbook is built around precision, parallel workflows, and hyper-efficient scheduling—meaning the team is always working on multiple phases at once.
This isn’t just one massive handover—it’s a series of tightly timed milestones designed to keep delivery fast, focused, and friction-free.
Meta doesn’t just build data centers—it builds systems that allow them to be delivered faster each time. The Richland Parish project follows the same high-efficiency model used in Meta’s other hyperscale builds: standardized templates, modular components, rapid procurement, and prequalified trade partners. This approach isn’t just about cost savings—it’s about reducing complexity in massive, time-sensitive builds.
Speed matters because the demands of AI infrastructure don’t wait. Meta needs more computing power, more storage, and more uptime to support platforms like Facebook, Instagram, and its AI research division. That means construction teams must be ready to deliver—at hyperscale velocity.
Repeatability plays a huge role here. Meta leverages lessons learned from previous builds and applies them directly to the next site. That means fewer design changes, faster permitting, and clearer expectations for vendors. Each campus—whether in Alabama, Ohio, or Louisiana—is part of a refined global delivery strategy.
At Richland Parish, that strategy is on full display. Every component is part of a system—from structural steel to underground power conduits. This eliminates guesswork and helps construction teams stay focused on execution.
Large-scale construction projects often face delays due to permitting, environmental reviews, or utility coordination. That hasn’t been the case with Meta’s Richland Parish AI Campus. One of the reasons construction moved so quickly from announcement to mobilization is the proactive role played by local and state agencies in streamlining approvals and infrastructure planning.
Before the first crew stepped onto the site, Louisiana Economic Development (LED), regional utility providers, and local municipalities were already collaborating with Meta’s project team. Land-use assessments, power planning, zoning, and early site access were prioritized and expedited. These partnerships allowed for smooth right-of-way coordination, rapid permitting, and timely access to critical resources like water, power, and fiber.
The result? An ultra-fast ramp-up timeline that would be difficult to replicate without this level of cooperation. Local governments recognized the transformative potential of the $10B investment and moved quickly to align their processes. The Richland Parish campus has become a model of what’s possible when public and private sectors work in sync to enable world-class construction at speed.
Time is money—and in Richland Parish, every agency involved helped save both.
The final phase of Meta’s construction timeline focuses on systems commissioning, testing, and operational readiness. Once each zone of the data center is built out, it undergoes a rigorous process of mechanical, electrical, and IT testing before it can support live infrastructure. This phase—while often overlooked—is where hyperscale builds either stay on schedule or fall behind.
Commissioning involves everything from verifying backup power systems and fire suppression to testing cooling infrastructure and network capacity. These activities are conducted in waves, aligned with zone-based turnover to prevent delays across the broader project. For a facility like Richland Parish, this also means coordinating with Meta’s global infrastructure team to integrate the new campus into the company’s global operations.
The go-live date isn’t just about flipping a switch—it’s about onboarding teams, validating redundancy systems, finalizing cybersecurity measures, and preparing the campus for full-scale AI workloads. With tens of thousands of servers expected to run in these halls, reliability is non-negotiable.
A strong finish isn’t automatic—it’s the product of strategic, tech-enabled coordination during the final push.
Discover how StruxHub can revolutionize your construction management. Contact us today!
Meta’s Richland Parish AI Campus isn’t just a standalone achievement—it’s a blueprint. The way this project was announced, executed, and supported will influence how future data centers (and other mission-critical builds) are delivered in the U.S. and around the world.
From preconstruction speed to modular build practices, the project reflects a shift in how tech infrastructure gets built. Gone are the days of 5-year delivery cycles and paper-based field tracking. Instead, hyperscale owners like Meta are proving that with the right systems and partnerships, facilities can go from site selection to early commissioning in under 36 months—without compromising quality or performance.
The Louisiana build also highlights the value of regional diversification. By choosing a rural, utility-rich location with room to grow, Meta is showing that AI infrastructure doesn’t have to cluster near Silicon Valley or East Coast hubs. That opens new doors for economic development, workforce training, and next-gen tech access in states like Louisiana, Texas, and beyond.
Richland Parish isn’t just the site of a $10B campus—it’s the foundation for how hyperscale construction will operate for the next decade.
In complex projects like Meta’s Richland Parish Data Center, staying on schedule requires more than good planning—it demands live coordination, streamlined reporting, and task clarity across every trade. That’s where StruxHub fits in. It’s a platform designed specifically to help field teams manage scheduling, communication, and progress tracking in real time.
StruxHub allows superintendents and project managers to assign tasks by zone, log updates from the field, and maintain live visibility into jobsite progress. Whether you’re coordinating 200 electricians or tracking MEP punch items across 15 turnover zones, StruxHub keeps the team aligned—without the chaos of scattered spreadsheets or delayed emails.
On hyperscale builds, the cost of delay can be astronomical. StruxHub helps reduce that risk by centralizing RFIs, inspections, and QA/QC workflows. Teams can view what’s complete, what’s behind, and what’s at risk—all in one dashboard. That’s the kind of insight it takes to deliver a project like Richland on time, every time.
As hyperscale owners demand more speed, transparency, and repeatability, StruxHub gives construction teams the tools to meet—and exceed—those expectations.
Experience the power of StruxHub today and witness firsthand how it can revolutionize your construction operations.
Construction for Meta’s Richland Parish AI Campus officially began in 2024, with site grading and infrastructure mobilization kicking off within weeks of the announcement. The facility, which will span more than 4 million square feet, is being delivered in phases. Industry projections suggest a 24–36 month buildout, with some mission-critical zones expected to be operational as early as mid-2025.
The timeline includes:
Meta’s build model emphasizes speed and repeatability, allowing work to proceed in overlapping waves across the campus. Rather than waiting for full project completion, early turnover zones are prioritized so core IT infrastructure can be installed and commissioned while other areas are still being constructed.
This phased strategy enables the company to go live with critical systems faster—meeting rising demands for AI infrastructure without waiting years for full completion. It also gives trades and inspection teams more flexibility to complete their work without congestion.
The Richland Parish project is expected to stay on track thanks to streamlined coordination with local agencies, experienced hyperscale contractors, and digital-first construction practices.
Meta’s construction approach is built around repeatability, speed, and standardization. Rather than starting each project from scratch, Meta uses a refined playbook—complete with pre-engineered systems, modular components, and digital coordination protocols—that can be applied to campuses across the country.
This strategy minimizes design risk and accelerates project mobilization. It also allows the company to work with a trusted group of vendors and trade partners who are already familiar with expectations. Instead of reinventing workflows for each new location, Meta focuses on execution—building faster while maintaining quality.
At the Richland Parish campus, this means:
This model results in faster delivery timelines, clearer communication, and a more predictable path to occupancy. For construction teams, it raises the bar—but also provides a clear structure to follow.
Public agencies have played a critical role in keeping Meta’s Richland Parish timeline on track. State and local governments, utilities, and permitting authorities coordinated closely with Meta’s project team during the early planning phase to fast-track approvals and infrastructure delivery.
This proactive support included:
By aligning infrastructure timelines with Meta’s construction schedule, these agencies helped reduce typical bottlenecks. For example, rather than waiting for utility upgrades to catch up with the project, local providers worked in parallel with contractors to install necessary power systems in sync with the build.
This kind of public-private collaboration is a blueprint for future mega-projects. It reduces friction, accelerates delivery, and builds goodwill between tech companies and host communities.
Hyperscale data centers—especially those designed to support AI infrastructure—introduce unique challenges for contractors, superintendents, and developers. These include:
Managing all of this requires digital coordination, daily reporting, modular construction techniques, and proactive scheduling. Teams must be trained to work with speed and accuracy, with minimal rework or handoffs between trades.
The Richland Parish campus is demonstrating how these challenges can be overcome—through tight planning, smart technology, and deeply aligned field leadership.
To prepare for hyperscale projects like Meta’s AI Campus, construction teams need to adopt a new playbook—one built around speed, digital coordination, and repeatability.
Start by digitizing your workflows. Paper reports and scattered spreadsheets slow down decision-making. Use centralized platforms for task tracking, RFIs, QA/QC, and daily updates so all stakeholders stay aligned in real time.
Next, train your team to work in phases. Zone-based turnover requires a mindset shift—from building a project all at once to delivering it in tightly sequenced handoffs. This means commissioning teams, inspection crews, and owner reps must all be looped in from the start.
Finally, invest in modular strategies and partner relationships. Whether it’s prefab mechanical rooms or repeatable electrical packages, standardization will be key. Work with vendors who can scale and subcontractors who understand hyperscale execution.
Projects like Richland Parish are just the beginning. The contractors who learn from them now will be the ones leading the next generation of mission-critical builds.